How long is the pool construction process?
Video transcription: We’re often asked how long is it going to take to build my swimming pool?
There are a couple of different elements that come together for that. Obviously we’ve worked through the time for contracting the swimming pool, designing it, doing all the bits necessary for now to be well on our way to having a pool in the backyard.
The next step for us is we need to manufacture it. Every Compass pool is built to order. We don’t build your swimming pool until we get an order for it. So it’s always your very own swimming pool, issued with its very own birth certificate. This is an important element of Compass Pools.
The other part of the process is that we need to have this pool approved. So it will be submitted to council, go through the approval process and depending on where you are, what council area, what state, there are going to be different times in relation to the approval process. The next part is then the installation process. We’re literally coming up with a day when we’re going to determine, after the council approval, to install your pool.
The process from there is generally fairly fast. It’s also dependent upon weather. If we have a bad run of weather, we’re going to need to move that installation date to a different time. When we come in and install your pool, generally it takes a couple of days for us to excavate and install the pool and fill it full of water. We then allow that pool to sit for a couple of weeks before installing an engineered concrete beam around it and finish the surrounds. Give one of the team a call today on 1300 667 445.